2019 ROAD RECONSTRUCTION PROJECTS

Listed below are the streets scheduled for Road Reconstruction for Summer, 2019.

Section 1 - Project Completed

Otterden Lane, Sedgmoor Lane, Aconbury Drive, Delemere Blvd., Sandpiper Hill,

Teal Drive

Section 2Project Completed

Smethwick Court, Lancashire Way

Section 3

Cathedral Oaks, Sylvan Glen Road, Bristol View Drive, Spruce Ridge Drive

Catch Basin repairs/replacements - Completed

Replacement of deteriorated gutter sections - Completed

Milling and Paving - July 29th - August 2nd - Completed

Section 4 

Kirkby Trail, Brackley Circle, Chardonnay Drive

Catch Basin repairs/replacements - Completed

Replacement of deteriorated gutter sections - Continuing through August 5th

Milling - August 22nd & 23rd

Paving - August 26th - August 30th

 

 

2019 Street Resurfacing

 

The Town of Perinton DPW has scheduled 55 Town roads for surface treatment as part of our 2019 Road Program. Below is the list of streets scheduled to be resurfaced between the dates of July 8th through July 26th.

 
This year we are using a treatment known as chip seal that provides a cost-effective, long-lasting protective coating over top of the existing aphalt roadway. Chip seal involves applying a thin layer of asphalt to the road followed by a layer of stone aggregate that is rolled into the new asphalt. The road will be open to traffic immediately following the chip seal. We will return after a few days to remove any loose stone from the road with our sweeping equipment.  Within 7-10 days we will apply a second treatment to the road known as fog seal, which helps seal the road surface and lock the new stone in place. The road will be drivable within an hour following the fog seal.
 
We will make every effort to minimize inconveniences caused by the work, but residents should expect some delays.  Bicyclists and pedestrians should take extra caution in work zones due to changes in road conditions during construction.  Thank you in advance for your patience and cooperation as we invest in our local roads to keep them safe and serviceable for years to come.
 
                                                                                                                                                                    Old Stonefield Way, Parkview Drive, Pond View Drive, Summerfield Circle - COMPLETED***
Wenham Lane, Westin Court, Wickersham Lane - COMPLETED***  
 
Amity Court, Beatrice Cove, Brannigan's Cut, Burnley Rise, Cambric Circle, Lands End Rise, Mattock Place - COMPLETED***
Peachtree Road, Simsbury Lane, Smallwood Drive, Sully's Trail, Tippet Way, Whittlers Ridge - COMPLETED***
 
Bending Oak Drive, Blandford Lane, Duncott Road, Hickory Lane, Little Acorn Circle - COMPLETED***
Mill Road, Oakwood Lane, Red Oak Lane, Salem Court, Weyburn Way, Wickford Way - COMPLETED***
Bown's Hill Lane, Stream View Circle, 
 
Bent Oak Trail, Folkside Lane, Shagbark Way - COMPLETED***
Crosswinds Circle. Monarch Drive, Nobleman Court, Piping Rock Run, Royale Drive - COMPLETED***
 
Bellflower Circle, Country Downs Circle, Foxpointe Circle, Lanaray Park, Wood Lily Lane - COMPLETED***
Camillia Rise, Copper Beech Run, Golden Bell Court, Nandia Pass, Springvale Pass, Tea Olive Lane  - COMPLETED***
 
 

As we work to improve your roads, the Town of Perinton appreciates your patience.

 

                 Jason R. Kennedy P.E., Commissioner of Public Works - 223-5115 